How to properly plan the repair of an apartment
Faced with the repair, the question arises how to properly and correctly plan your accommodations, as well as aesthetic and comfortable.
Getting repair for the first time, without deliberate action, you can prevent many errors that will lead to irreversible consequences or will entail additional work and, in the worst case contingencies. No matter what apartment you are going to make repairs in the old Fund or the new building. First, what prompted you to make your accommodation as comfortable and to practical.
When there is no plan, accordingly, it cannot distribute its capabilities. So, to all quickly and painlessly moved, need to make a plan. He is a pillar not only in saving time and money, but also you will be able to control builders who will run, and also contributed to a clearer solution and cost of repair.
So, all in order:
• The first is messy and cumbersome:
- dismantling, namely redevelopment,
- changing the materials of the ceilings, walls and floors,
- move or install additional walls,
- do not forget about the doors and Windows should be the first change at the initial stage.
- removal of construction debris.
• The second is all works that are associated with the alignment of the sexes, namely the coupler. 100% of the work required in 99 cases. When the floor with big differences, then a layer of screed will be a long time to dry, so you should consider the time for drying and solidification of the floor, to avoid any inconvenience of transportation in the apartment.
• The next step should be replacement of the sewage and heating systems, and wiring. During these stages, it should sharpen the attention, because after the finishing of the work already, it will be very difficult to get to communications, which would entail costs. Installation of pipes and wiring run for long time use because they are hidden deep in the finish and most importantly in the early stages to think carefully.
• The next stage plan - draft work, namely, alignment of walls: plaster and putty finish. Here came the time of preparation to finish the decoration of the room. Lined the walls, don't forget primed with primer deep penetration.
• And here is the finish work. The conclusion of all works will be replacement of all interior doors, painting ceiling, interior decoration of walls and repairs brought to full perfection.